After having tile sit around for about 2 years we finally got it installed in our kitchen. Luckily after 2 years I am still happy with our choice. It took us pretty much a day. I was happy we did the more intricate part first, around the window. The second wall behind the stove we just flew through.
So after staring at a plywood backsplash for 2 years this looks so much better.
Other projects going on are:
- more doors getting installed, which will need to be painted.
-working on the drywall screw pop-outs and then painting over them( which will be almost half our house getting painted)
- Designing and installing closet organizers, which Trevor is making himself
-and then there's the the ever present fireplace. More plywood staring at us. We have the stone for it, it's just getting up the nerve to actually do it.
3 comments:
That looks so good!!
Love love love!
It looks awesome. Nice choice and good work installing it. The saying is that finishing is 10% of the job but takes 90% of the time is so accurate. I just quit looking at drywall patches in the basement staircase (where I dropped the ladder after I painted the wall the first time) as I finally patched and painted it again after 3 years!!
Good luck with the rest of the projects - looking forward to more great reveals.
Post a Comment